Survey the complete opening

The existing vent, curb or frame, surrounding glazing, support, weathering and control connections all form part of the replacement problem. Dimensions alone are not enough.

Coordinate controls and interfaces

The project team should confirm how the new vent will be powered, controlled, tested and integrated with the relevant building systems. Responsibilities for wiring, controls and commissioning should be clear.

Plan occupied-building work

Replacement may require temporary protection, safe isolation, internal segregation and phased working. Access for future inspection and maintenance should be considered at the same time.

Discuss the project

Every building, opening and glazing package is different. This guidance is general and should be checked against the requirements, current standards and competent design information for the specific project.

PROJECT & TENDER ENQUIRIES

Let's discuss your next project.

Whether you're exploring a glazing solution or preparing a formal tender, our team is ready to discuss your requirements.